Buckinghamshire

Prefabricated construction using 100% British steel. 

12.00 metres span x 24.7 metres long x 4.425 eaves height. Originally a non-insulated building supplied and erected in 2003, this building was re-clad, insulated and relocated by the client on a newly prepared base.