Heathrow

Prefabricated modular construction built using British steel. 

In November 2014 Quickway Buildings were commissioned to supply a Quickway eco-friendly building modified in line with the architect’s requirements for a temporary flight connection centre at Heathrow Airport. This modified structure covered an area of 31 metres span by 64.36 metres long and comprised a double row of 15.00 metres span modules supported centrally by a hot-rolled frame. The building was installed on a 5.00 metres high concrete platform and was required whilst airport renovations were carried out to terminal three.

Our use of cookies

We use necessary cookies to make our site work. We'd also like to set analytics cookies that help us make improvements by measuring how you use the site. These will be set only if you accept.

For more detailed information about the cookies we use, see our Cookies page. Cookie Control Link Icon


Necessary cookies

Necessary cookies enable core functionality such as security, network management, and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.