North Lincolnshire
Storage/Workshop Building. 11.8 metre span x 43.8 metres long x 5.51 metres eaves.
Prefabricated construction using British steel. 100% eco-friendly building.
Specification included 2 no. 3 phase operated insulated roller shutter doors, an internal partition with 60-minute fire insulation and 3 no. personnel doors. 1 no. internal partition. 2 electrically operated roller shutter doors to one side partition.
Erection completed in approximately 16 days.